| Design & Supply Scrapper Traps for Teluk Gong, Melaka. |
Ho-Hup Construction Co |
Oct. 1994 |
| Complete Design & Supply of Duel Oil Systemfor Lumut Power Plant - ABB Power Generation |
MRCB Zelleco |
Sept. 1995 |
| Design of Water Surge Tank & Fatty Acid Separator (Process & Mechanical) - FPG Kuantan. |
FPG Oleochemical Sdn Bhd |
Nov. 1994 |
| Design of Sodium Barohydride Shell & TubeExchanger - FPG Kuantan |
Syarikat Steelcon Sdn Bhd |
Nov. 1994 |
| Design & Supply Drawings for Oil Sludge Tank -FPG Kuantan |
FPG Oleochemical Sdn Bhd |
Dec. 1994 |
| Pipe Stressing Analysis for Mass Flow Upgrade - FPG Kuantan |
FPG Oleochemical Sdn Bhd |
Jan. 1995 |
| Design for Stream Water Scrubber - Process,Piping including Vessel & Stressing |
FPG Oleochemical Sdn Bhd |
Jan. 1995 |
| Design for 13 units Conveyor Belts System |
Syarikat Steelcon Sdn Bhd |
Mar. 1995 |
| Design & Drawing for Piping System of Desulfurisation System unit MAE MOH Power Plant Thailand |
GEA-GWU Germany |
Oct. 1995 |
| Procorument assistant for Materials & Equipment for Desulfurisation System, MAE MOH Power Plant, Thailand |
GEA-GWU Germany |
Nov. 1995 |
| Design & Supply 4 units of Media Exchangers for Desulfurisation System, MAE MOH Power Plant, Thailand |
GEA-GWU Germany |
Sept. 1995 |
| Supply & Supervisor fabrication work on Air CoolerRecycle Heat Exchanger for MSE - Johor |
Titan Petrochemical Sdn Bhd |
July. 1996 |
| Design & Supply 2 Units of Heat Exchangers Intersage Cooler and Chiller - Bintulu Sarawak |
Asian Bintulu Fertilizer Plant |
Nov. 1996 |
| EPPC of Lateral Gas Pipeline System to Indemitsu Chemical Plant - Pasir Gudang, Johor. |
Petronas Gas Berhad |
Sept. 1996 |
| Design & Supply of 36 Units Heat Exchangers for PSR2Project (fabrication work at MSE) - Melaka |
Petronas Gas Berhad |
Mar. 1997 |
| Pipe Stressing analysis for Fatty Acid Upgrade -FPG Kuantan |
FPG Oleochemical Sdn Bhd |
Feb. 1996 |
| Design & Supply of Dump Tank Drainage System for Lumut Power Plant |
ABB Power Generation |
Jan. 1996 |
| EPPC of Lateral Gas Pipeline System & GasConditioning System at Bintulu Silica Industries Sdn Bhd |
Petronas Gas Berhad |
Nov. 1996 |
| Supply of 3 units Tube Bundles to Melaka Refinery -Assemblies Work at MSE Johor |
Petronas Melaka Refinery |
Nov. 1996 |
| Design & Supply 1 Unit Reboiler Stabilizer for EPMI at TCOT Project Extension, Kertih |
Technip (M) Geoproduction |
Jan. 1997 |
| Design Assistance 2 Units Reboiler for Titan Petrochemical Plant - Johor |
Syarikat Steelcon Sdn Bhd |
Feb. 1997 |
| EPCC Fuel Oil System Extension Project at Lumut Power Plant, Lumut, Perak |
ABB Power Generation |
April. 1997 |
| Pipe Stressing Analysis for Fatty Acid System at FPG Kuantan |
FPG Oleochemical Sdn Bhd |
Mar. 1997 |
| EPCC of Gas Metering Station at Bintulu Edible Oil -Bintulu Sarawak |
Bintulu Edible Oil Sdn Bhd |
June. 1997 |
| Supply of Fuel Oil & Fuel Gas System to Karambunai IPP Project at Sabah |
Paremba-Kentz Engineering |
Dec. 1997 |
| Supply of 1 Unit Gas Heater for Karambunai IPP Projectat Sabah |
Paremba-Kentz Engineering |
Jan. 1998 |
| EPCC of City Gate Station at Serdang,Selangor |
Petronas Gas Berhad |
Mar. 1998 |
| EPCC of City Gate Station at Senai,Johor. |
Petronas Gas Berhad |
April. 1998 |
| Emergency Feedwater Boiler Pump Supply for Petronas Methanol Labuan Plant |
Petronas Methanol Labuan |
Aug. 1998 |
| Kuantan Compressor Filter / Separator Upgrades at Kuantan, Pahang. |
Petronas Gas Berhad |
Feb. 1999 |
| Design & Supply Dry Gas Filter for Putrajaya -Gas Cooling District |
Ho-Hup Construction |
Jun. 1998 |
| Design & Suppply Dry Gas Filters for Kertih MeteringStation (Petronas Gas Berhad) |
MMC Engineering Sdn Bhd |
Sept. 1998 |
| Fuel Oil Unloading & Fuel Oil Forwarding for Titan Tanjung Langsat Plant - Johor |
ABB Power Generation |
Nov. 1998 |
| Design & Supply dry Gas Filter for Titan Tanjung Langsat Metering Station - Johor |
Transwater API Sdn Bhd |
Nov. 1998 |
| Design & Supply Dry Gas Filter for Kertih Amonia Plant (Petronas Gas Berhad) - Kertih, Terengganu |
MMC Engineering Sdn Bhd |
Feb. 1999 |
| Design & Supply Diesel Fuel Filters for Sotong Platform(Petronas Carigali Berhad) |
Shapadu Energy & Eng. |
Nov. 1998 |
| Design & Supply Dry Gas Filters & Propane Filter for Propane Dehydrogen Plant at MTBE Kuantan |
MTBE/Stone & WebsterLtd. UK |
Mar. 1999 |
| EPCC of C.U.F. Metering Station & Pipeline at Gebeng Kuantan |
Petronas Gas Berhad |
Jun. 1999 |
| Design & Supply of Dry Gas Filters for Te Kowhai City Gate Station & Te Rapa Sales Station at New Zealand |
Natural Gas Corporation |
Jan. 1999 |
| Design & Supply of Dry Gas Filters for B.A.S.F MeteringStation (Petronas Gas Berhad) at Gebeng |
Tractor (M) Sdn Bhd |
April. 1999 |
| Design & Supply S.C.T.U Filters for Propane DehydrogenPlant at MTBE Kuantan |
M.T.B.E (M) Sdn Bhd |
Aug. 1999 |
| EPCC of Gas Metering Station at Polyplastic AsiaPacific Sdn Bhd - Gebeng Kuantan |
Polypastic Asia Pacific |
Sept. 1999 |
| Design & Supply of Dry Gas Filters at Kamunting Metering Station - Taiping Perak |
Ho-Hup Construction |
Aug. 1999 |
| Design & Supply of Dry Gas Filters at Gelugor Metering Station - Pulau Pinang |
Ho-Hup Construction |
Sept. 1999 |
| EPCC of Lateral Gas Pipeline at P.D.H Metering Station - Gebeng Kuantan |
Petronas Gas Berhad |
Feb. 2000 |
| Supply of Manpower for Gas Pipeline Modification at Port Dickson Power Station |
Port Dickson Power |
Oct. 1999 |
| Supply & Fabrication Heat Exchanger at Kertih Terengganu |
Linde / Selas |
April. 2000 |
| Design, Supply & Fabrication of Fuel Gas Superheater at Thailand |
Electrowatt Eng. (Thai) Ltd |
Jan. 2000 |
| Design, Supply & Fabrication of Heat Exchanger at Thailand |
Electrowatt Eng. (Thai) Ltd |
Dec. 1999 |
| EPCC for Filter / Separator Installation Project at 36"YTL / Paka, GPP A, Kertih, Terengganu. |
Petronas Gas Berhad |
July. 2000 |
| Design, Supply & Fabrication of Fuel Gas Superheater atLeam Chabang Plant Thailand |
Fortum Engineering Ltd |
April. 2000 |
| Supply of Filter to Angsi-A Platform |
Sime Sembcop Sdn Bhd |
Dec. 2000 |
| Supply of Scrapper Launcher & Receiver for Tanjung Langsat & Kulim Lateral Pipeline System |
OGP Technical Services |
Feb. 2001 |
| Bayu Undan Miscellaneous Filters |
TIGA Joint Ventures |
March. 2001 |
| Design & Supply of Dry Gas Filters for Kulim Lateral Pipeline System |
Dialog E&D sdn Bhd |
Mar. 2001 |
| Design & Supply of Liquid Propylene Filter at Thailand |
Match Cross Eng. CoLtd. Thailand |
May. 2001 |
| Design & Supply Gas Lift Scrubber |
Shell Sarawak Berhad |
May. 2001 |
| Design & Supply 2 Units Gas Fired DewPoint Heater for |
Alstom Power Asia |
June. 2001 |
| Swanbank Plant - Australia |
Pacific Sdn Bhd |
|
| Design & Supply of Dry Gas Filter for Alor Gajah MeteringStation - Melaka |
Transwater API Sdn Bhd |
Nov. 2001 |
| Design & Supply 2 Units Gas Fired DewPoint Heater for |
Alstom Power Asia |
May. 2002 |
| Perlis IPP Power Plant |
Pacific Sdn Bhd |
|
| Instrument Air Receiver and Utility Air Receiver Skid |
Petronas CarigaliSdn Bhd |
Mar. 2002 |
| Design & supply of Pressure Vessel - Glycol SurgeVessel |
Sarawak Shell Berhad |
Jun. 2002 |
| Design & supply of Filter/Strainer Vessel |
Sarku Engineering ServicesSdn Bhd |
May. 2002 |
| Design & supply of Gas Separator for Tapis F Topsides |
Sime SembcorpEngineering Sdn Bhd |
Jul. 2002 |
| Design & supply of Filter Vessels for Perlis Lateral Pipeline Project |
Homeg Sdn Bhd |
Sept. 2002 |
| Design, supply & delivery of Filter Separator for Irong Barat-A Expansion Project |
ExxonMobil Exploration &Production Malaysia Inc. |
Nov. 2002 |
| Design & supply of Condensate Filter for Resak OGTProject |
Karnival Dagang Sdn Bhd |
Jul. 2002 |
| Design & supply of Instrument Gas Cooler |
Rnz Integrated (M) Sdn Bhd |
Jan. 2003 |
| Design, supply and install of Oil-Water Separator (V-700) |
Haven Engineering (M) |
Dec. 2002 |
| for Semarang-B Water Disposal Project |
Sdn Bhd |
|
| Design & supply of Instrument Gas Post Drier Filter |
Rnz Integrated (M) Sdn Bhd |
Jan. 2003 |
| Design & supply of Instrument Gas Pre-Filter |
Rnz Integrated (M) Sdn Bhd |
Feb. 2003 |
| Design & supply of Gas Scrubber |
Rnz Integrated (M) Sdn Bhd |
Feb. 2003 |
| Modification of Surge Vessel (V-300) at Semarang-BWater Disposal Project |
Haven Engineering (M) Sdn Bhd |
Jan. 2003 |
| Design and supply of Condensate Pods for B11 PAUtility Topside |
Sime Sembcorp EngineeringSdn Bhd |
Apr. 2003 |
| Design and supply of Fuel Gas Conditioning Packagefor West Patricia |
Murphy Sarawak Oil Co. Ltd. |
Aug. 2003 |
| Design and Supply of Instrumentation Equipment and Accessories |
Murphy Sarawak Oil Co. Ltd. |
Oct. 2003 |
| EPCC of Nilai City Gate Station at Nilai, Seremban,Negeri Sembilan |
Petronas Gas Berhad |
May. 2004 |
| Design and supply of Dry Gas Filter for Tangga BatuCity Station, Melaka |
HL Engineernig Sdn Bhd |
Feb. 2004 |
| Design and supply of Dry Gas Filter for PlentongCity Gate Station, Johor Bahru |
Transwater API Sdn Bhd |
Feb. 2004 |
| Design and supply of Inlet filter for EPCC of BatangBerjuntai, Selangor |
Global Globe (M) Sdn Bhd |
May. 2004 |
| Design and supply of Instrument Gas Cooler for BKCand BRC Replacement |
Rnz Integrated (M) Sdn Bhd |
Jun. 2004 |
| Design and supply of Diesel Tank for West NatunaProjects Phase II |
HL Engineernig Sdn Bhd |
May. 2004 |
| Supply and Design of Fuel Gas System for WestPatricia Development Project Phase II |
Murphy Sarawak Oil Co. Ltd. |
Jul. 2004 |
| Supply and design of Tote Tanks for Guntong-EProject |
Mecomb EngineeringSdn Bhd |
Feb. 2005 |
| Supply and Design of Seal Gas Separator/Seal GasFilter Coalescer for Guntong-E Project |
Sime Sembcorp EngineeringSdn Bhd |
Feb. 2005 |
| Design and supply of Fuel Gas Scrubber skid - Barton |
Sabah Shell PetroleumCompany Limited |
May. 2005 |
| Design and supply of Fuel Gas Filter Separator |
Kvaerner Process SystemsAsia Pacific Sdn Bhd |
Sep. 2005 |
| Design and supply of Filter Element for Espardate, Brazil |
Kvaerner Process SystemsAsia Pacific Sdn Bhd |
Nov. 2005 |
| Design and supply of Fuel Gas Dew Point Heater toKeppel Merlimau Power Plant, Singapore |
Alstom Power Asia PacificSdn Bhd |
Jan. 2006 |
| Design and supply of Scrapper Launcher and Receiver for Mala Development Project, Sudan |
Muhibbah Engineering (M)Berhad |
Jun. 2006 |
| Supply and design of Fuel Gas Heater for TNP PowerStation Expansion Project, Thailand. |
Mitsubishi Heavy Industries,Ltd |
Aug. 2006 |
| Consultation and Comprehensive Study for E-503Kuantan |
FPG Oleochemicals SdnBhd |
Aug. 2006 |
| Supply and design of Pressure Vessels for Kuantanm Compressor Expansion |
Tractors Malaysia (1982Sdn Bhd) |
Sept. 2006 |
| Supply and design of Pressure Vessels for Segamat Compressor Expansion |
Tractors Malaysia (1982)Sdn Bhd |
Sept. 2006 |
| Supply and design of Drain Tank for KuantanCompressor Expansion |
Tractors Malaysia (1982Sdn Bhd) |
Sept. 2006 |
| Supply and design of Service Water Filter forSumandak Project |
Sime Darby EngineeringSdn Bhd |
Mar. 2007 |
| Supply and design of Launcher and Receiver forSumandak Project |
Sime Darby EngineeringSdn Bhd |
Apr. 2007 |
| Supply and design of Filter Separator for AlintaProject, Australia. |
Process Materials AustraliaPte. Ltd. |
May. 2007 |
| Supply and design of Gas Filter c/w Modco QuickOpening Closure for Metering Station, Banting. |
MMC Engineering ServicesSdn Bhd |
Jun. 2007 |
| Supply and design of Scrapper Launcher andReceiver for Metering Station, Banting. |
MMC Engineering ServicesSdn Bhd |
Aug. 2007 |
| Supply and design of Pig Receiver for Nigeria Project. |
Bumi Armada Berhad |
Sept. 2007 |
| Supply and design of Scrapper Launcher and Receiver for Pakistan Heera Project. |
Syarikat Steelcon Sdn Bhd |
Dec. 2007 |
| Supply and design of Scrapper Trap for PakistanProject. |
Pt. Sempec |
Oct. 2007 |
| Supply and design of Pressure Vessel for ArrowEnergy, Australia |
Process Materials AustraliaPte. Ltd. |
Oct. 2007 |
| Supply and design of Completion Fluid Filter for Dumai Project |
Pt. Proses MaterialIndonesia |
Sep. 2007 |
| Supply and design of Scrapper Trap for MalaDevelopment Project |
Muhibbah PetrochemicalEngineering Sdn Bhd |
Jan. 2008 |
| Design and supply of Diesel Filter Coalescer Vesselfor Worley Parsons, Australia |
Process Materials AustraliaPty. Ltd. |
Jan. 2008 |
| Design and supply of Filter Vessels for PT. Tripatra |
PT. Proses Material Indonesia |
Jan. 2008 |
| Engineering Detail and Drawing of Gas Coalescer for Fabrication purpose. |
PT. Proses Material Indonesia |
Oct. 2007 |
| Design and supply of Scrapper Trolley with Castorfor Gas Pipeline to Lion Group Banting, Selangor |
MMC Engineering ServicesSdn Bhd |
Jan. 2008 |
| Design and supply of Dry Gas Filter for PDH Metering Station Gebeng, Kuantan. |
Inter Region EngineeringSdn Bhd |
Mar. 2008 |
| Design and supply Fuel Gas Separator for SarawakShell |
MSET Engineering Corporation Sdn Bhd |
Mar. 2008 |